PetaAI
Business Strategy

Check Zoning and Permits Before Leasing a Business Space: RDTR, KBLI and PBG

Do not find out after paying the rent that your business is not allowed at that address. This guide explains KBLI, RDTR, KKPR and PBG, and the order to check them in before you sign.

ByTim Riset PetaAI

A man crouches on the floor of an empty shophouse, checking documents and a colour-coded zoning map

It is a common sequence: find a shophouse (ruko) that feels right, pay a year's rent upfront, fit it out, and only then apply for permits. That is when some owners discover that their type of business is not allowed at that address, or that the building's papers are a problem.

At that point the options are poor: change the concept, wait on an uncertain process, or move out and lose the rent and the fit-out. So check zoning and permits before you sign, as part of the 7 factors for choosing a business location.

Pin down your KBLI code

KBLI (Klasifikasi Baku Lapangan Usaha Indonesia) is Indonesia's standard classification of business activities, compiled by BPS, the national statistics agency. You choose your code in OSS (Online Single Submission), the government's online licensing system, when you apply for your business identification number (Nomor Induk Berusaha, NIB). The KBLI code is the basis for your business's risk level and, together with the location, determines which permits you need.

Do not guess the code. Search for your activity in OSS and read each code's description, because activities that sound alike can have different codes.

Check the RDTR: is your activity allowed in that zone?

The RDTR (Rencana Detail Tata Ruang) is the detailed spatial plan drawn up by the local government. It divides an area into zones, such as residential, trade and services, or offices. Each zone has rules on which activities are allowed there, usually set out in a table with this notation:

Notation

Meaning

I

Permitted (diizinkan)

T

Permitted with limits (terbatas), for example on floor area, quantity or opening hours

B

Conditionally permitted (bersyarat), with extra requirements to meet

X

Not permitted

The wording can vary slightly between regions. What matters is that a shophouse is not automatically fine for any business: activities that are noisy, open late into the night or produce waste can be T, B or X in some zones. Turning a house in a residential estate into a business needs a closer look.

KKPR: the spatial check in OSS

KKPR (Kesesuaian Kegiatan Pemanfaatan Ruang), or spatial-use conformity, is the check within the OSS licensing process that your business activity fits the spatial plan at that location.

Where a digital RDTR has been integrated into OSS, the check can be quicker. Elsewhere, KKPR goes through an approval process that can take longer. The procedure can also differ by business size, so ask your local DPMPTSP.

PBG or IMB: check the building's papers

The PBG (Persetujuan Bangunan Gedung), or building approval, replaced the old building permit, the IMB (Izin Mendirikan Bangunan). The PBG is generally the building owner's responsibility, not the tenant's, and older buildings may still have an IMB. As a tenant, ask to see the document and check:

  • That a PBG or IMB exists and its address matches the building you are leasing.

  • The building function stated on it, such as residential, business or mixed. A house you plan to use for business may need a change of function.

  • Whether the building has been extended or altered since the permit was issued, for example with an added floor.

Where to check the zoning of an address

  • GISTARU, the online spatial planning map from the Ministry of Agrarian Affairs and Spatial Planning (Kementerian ATR/BPN), which shows the RDTR in areas that have one.

  • The local government's spatial planning portal or office. The department name varies by region, for example Dinas PUPR or Dinas Cipta Karya dan Tata Ruang.

  • DPMPTSP (Dinas Penanaman Modal dan Pelayanan Terpadu Satu Pintu), the one-stop licensing office in your region.

When you ask, bring the full address, the map coordinates and your KBLI code.

The order of checks before signing

  1. Pin down your KBLI code in OSS.

  2. Look up the site's zone on GISTARU or the local government portal, and see your activity's status: I, T, B or X.

  3. Confirm with the DPMPTSP or the spatial planning office, especially if the status is T or B, or if no map is available.

  4. Ask the owner for copies of the land certificate and the PBG or IMB. Check the owner's name, the address and the building function.

  5. If your business needs an extra sector permit, for example a clinic or a pharmacy, ask about the requirements early.

  6. If the site sits among homes, talk your plans through with the neighbourhood heads (RT/RW).

  7. Add permit costs and any building adjustments to your break-even calculation, then sign the lease with protective clauses.

Lease clauses worth discussing

Points to raise with the owner, not legal advice. For a large contract, have a notary or legal adviser review it.

  • The rent and deposit are refunded if the permit for your business activity is refused within a set period after signing.

  • The owner provides copies of the land certificate, the PBG or IMB, and proof that the land and building tax (PBB) is paid.

  • The owner agrees to sign any documents needed for your permits.

  • A written agreement on who pays if the building has to be adjusted for the permit to be issued.

Where location data fits in

Loka by PetaAI does not check zoning or permits. Its role comes earlier: judging whether an address looks promising as a business through a feasibility score, a competitor analysis within a 1 km radius and a transport score from 0 to 100. Use Loka to narrow many candidate sites down to the two or three most viable, then check zoning and building papers for those sites only. For the other things to see in person, use our on-site location survey checklist.

Frequently asked questions

How do I find out the zoning of an address in Indonesia?

Check the RDTR map on GISTARU from Kementerian ATR/BPN or the local government's spatial planning portal. If there is no map for that area, or your activity's status is unclear, ask the spatial planning office or the DPMPTSP.

How do I find the right KBLI code?

Search for your activity in OSS and read each code's description, not just its title. If your business covers several activities, such as a café that also sells packaged coffee beans, you may need more than one KBLI code.

What is the difference between an IMB and a PBG, and who arranges it?

The PBG is the building approval that replaced the IMB, and older buildings may still have an IMB. Both are generally the building owner's responsibility, while the tenant handles their own business licensing through OSS. Still, ask for a copy and check the building function before you sign.

Analyze franchise locations with LokaTry Loka